AB 1191: California Renewables Portfolio Standard Program: hydroelectric generation.
This bill aims to amend the California Renewables Portfolio Standard program to expand its scope. The existing program requires utilities to procure a certain amount of renewable energy each year, and it currently includes small hydroelectric generation facilities with a capacity of 30 megawatts or less. The proposed change would broaden the definition to include all hydroelectric generating facilities, making it easier for utilities to meet the program's goals. This expansion would help increase the use of hydroelectric power in California.
| Feb. 02, 2026 | From committee: Filed with the Chief Clerk pursuant to Joint Rule 56. |
| Jan. 31, 2026 | Died pursuant to Art. IV, Sec. 10(c) of the Constitution. |
| Apr. 02, 2025 | In committee: Set, first hearing. Failed passage. Reconsideration granted. |
| Mar. 10, 2025 | Referred to Coms. on U. & E. and NAT. RES. |
| Feb. 24, 2025 | Read first time. |
| Introduced by Assembly Member Tangipa |
February 21, 2025 |
LEGISLATIVE COUNSEL'S DIGEST
The people of the State of California do enact as follows:
SECTION 1.
Section 44258.5 of the Health and Safety Code is amended to read:44258.5.
(a) ForSEC. 2.
Section 399.12 of the Public Utilities Code is amended to read:399.12.
For purposes of this article, the following terms have the following meanings:(a)“Conduit hydroelectric facility” means a facility for the generation of electricity that uses only the hydroelectric potential of an existing pipe, ditch, flume, siphon, tunnel, canal, or other manmade conduit that is operated to distribute water for a beneficial use.
(b)
(c)
(d)
(e)
(1)(A)An existing small hydroelectric generation facility of 30 megawatts or less shall be eligible only if a retail seller or local publicly owned electric utility procured the electricity from the facility as of December 31, 2005. A new hydroelectric facility that commences generation of electricity after December 31, 2005, is not an eligible renewable energy resource if it will cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(B)Notwithstanding subparagraph (A), a conduit hydroelectric facility of 30 megawatts or less that commenced operation before January 1, 2006, is an eligible renewable energy resource. A conduit hydroelectric facility of 30 megawatts or less that commences operation after December 31, 2005, is an eligible renewable energy resource so long as it does not cause an adverse impact on instream beneficial uses or cause a change in the volume or timing of streamflow.
(C)A facility approved by the governing board of a local publicly owned electric utility prior to June 1, 2010, for procurement to satisfy renewable energy procurement obligations adopted pursuant to former Section 387, shall be certified as an eligible renewable energy resource by the Energy Commission pursuant to this article, if the facility is a “renewable electrical generation facility” as defined in Section 25741 of the Public Resources Code.
(D)(i)A small hydroelectric generation unit with a nameplate capacity not exceeding 40 megawatts that is operated as part of a water supply or conveyance system is an eligible renewable energy resource only for the retail seller or local publicly owned electric utility that procured the electricity from the unit as of December 31, 2005. No unit shall be eligible pursuant to this subparagraph if an application for certification is submitted to the Energy Commission after January 1, 2013. Only one retail seller or local publicly owned electric utility shall be deemed to have procured electricity from a given unit as of December 31, 2005.
(ii)Notwithstanding clause (i), a local publicly owned electric utility that meets the criteria of subdivision (j) of Section 399.30 may sell to another local publicly owned electric utility electricity from small hydroelectric generation units that qualify as eligible renewable energy resources under clause (i), and that electricity may be used by the local publicly owned electric utility that purchased the electricity to meet its renewables portfolio standard procurement requirements. The total of all those sales from the utility shall be no greater than 100,000 megawatthours of electricity.
(iii)The amendments made to this subdivision by the act adding this subparagraph are intended to clarify existing law and apply from December 10, 2011.
(f)
(g)
(h)
(B)Electricity generated by a small hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (A) or (D) of paragraph (1) of subdivision (e).
(C)Electricity generated by a conduit hydroelectric generation facility shall not result in the creation of a renewable energy credit unless the facility meets the requirements of subparagraph (B) of paragraph (1) of subdivision (e).
(D)
(i)
(j)
(k)