Election 2026

The November 3 election will reshape legislatures. Stay current on every seat, staff, and committee change with GovBuddy.

Stay Current
Home/Bills/A 232New York · 2025–2026 Legislative Session
Assembly BillIntroduced

A 232: Requires standards for the new construction of electric vehicle charging stations to require such stations to have an external automatic cutoff switch.

New York · Assembly · 2025–2026 Legislative Session · last verified January 8, 2026

What A 232 does, verified January 8, 2026

The bill requires standards for the new construction of electric vehicle charging stations, which must include an external cutoff switch that can cut off power to the vehicle without the need for a key or unlock the device. This switch must be placed outside of the house or garage. The requirements apply to both the sale or transfer of a residence with a permanently installed electric vehicle charging station and the construction of new charging stations. The standards take effect immediately.

Bill journey
1IntroducedCurrent
2In CommitteePending
3First Chamber FloorPending
4Second ChamberPending
5GovernorPending
6ChapteredPending
Last action: referred to governmental operations (2026-01-07)Alert me
Recent actions2 total · showing 2
Jan. 07, 2026referred to governmental operations
Jan. 08, 2025referred to governmental operations
Latest bill textIntroduced version, January 8, 2025 · 266 words
  
  STATE OF NEW YORK ________________________________________________________________________ 232 2025-2026 Regular Sessions  IN ASSEMBLY (Prefiled) January 8, 2025 ___________ Introduced by M. of A. EACHUS -- read once and referred to the Committee on Governmental Operations AN ACT to amend the executive law, in relation to requiring standards for the new construction of electric vehicle charging stations to require such stations to have an external cutoff switch The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Subdivision 20 of section 378 of the executive law, as 2 renumbered by section 3 of part RR of chapter 56 of the laws of 2023, is 3 renumbered subdivision 21 and a new subdivision 20 is added to read as 4 follows: 5 20. Standards requiring new construction of permanently installed 6 residential electric vehicle charging stations to include an external 7 cutoff switch. Such requirements shall also apply to the sale or trans- 8 fer of a residence containing a permanently installed electric vehicle 9 charging station. A cutoff switch shall be a hand-operated switch which 10 is capable of cutting off all power and electricity to the vehicle with- 11 out the need of a key or to unlock the device. For permanently 12 installed residential electric vehicle charging stations, such cutoff 13 switch shall be placed outside of the house or garage. 14 § 2. This act shall take effect immediately. EXPLANATION--Matter in italics (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD01414-01-5 
Text of A 232 as introduced, from the official record. Connect Plus keeps every version and highlights what changed.Compare versions
GovBuddy Demo

See how GovBuddy fits your team.

Share a few details and our team will follow up with a focused walkthrough.