Election 2026

The November 3 election will reshape legislatures. Stay current on every seat, staff, and committee change with GovBuddy.

Stay Current
Home/Bills/A 2670New York · 2025–2026 Legislative Session
Assembly BillIntroduced

A 2670: Requires cell towers to be equipped with a back-up power source in case of a power outage.

New York · Assembly · 2025–2026 Legislative Session · last verified January 8, 2026

What A 2670 does, verified January 8, 2026

The bill requires every owner or operator of macro cell tower sites in the state to equip them with an emergency back-up power source capable of providing adequate power to maintain operation in case of a power outage. The back-up power source must use a renewable energy system, fuel cell electric generating equipment, or an energy storage system and be able to power a macro cell tower site for at least seventy-two hours. Existing sites do not need to be updated if they already have an emergency back-up power source prior to the bill's effective date. The definition of a macro cell tower site includes places where wireless telecommunications equipment and network components are located, excluding rooftop, small cell, and distributed antenna system sites. The bill takes effect ninety days after it becomes a law.

Bill journey
1IntroducedCurrent
2In CommitteePending
3First Chamber FloorPending
4Second ChamberPending
5GovernorPending
6ChapteredPending
Last action: referred to corporations, authorities and commissions (2026-01-07)Alert me
Author and sponsors
Full contact details, staff, and committees with Connect, $16/moUnlock
Coauthors
Angelo SantabarbaraChris TagueJohn LemondesMaryJane ShimskyMatthew SlaterJoe DeStefanoDeborah GlickRodneyse Bichotte HermelynJo Anne SimonJarett GandolfoKeith BrownJoseph Giglio
Recent actions2 total · showing 2
Jan. 07, 2026referred to corporations, authorities and commissions
Jan. 21, 2025referred to corporations, authorities and commissions
Latest bill textIntroduced version, January 21, 2025 · 435 words
  
  STATE OF NEW YORK ________________________________________________________________________ 2670 2025-2026 Regular Sessions  IN ASSEMBLY January 21, 2025 ___________ Introduced by M. of A. SAYEGH, SANTABARBARA, TAGUE, LEMONDES, SHIMSKY, SLATER, DeSTEFANO, GLICK, BICHOTTE HERMELYN, SIMON, GANDOLFO, K. BROWN, GIGLIO -- read once and referred to the Committee on Corpo- rations, Authorities and Commissions AN ACT to amend the general business law, in relation to requiring cell towers to be equipped with a back-up power source in case of a power outage The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. The general business law is amended by adding a new section 2 399-yyyyy to read as follows: 3 § 399-yyyyy. Macro cell tower sites; back-up power. 1. Every owner or 4 operator of macro cell tower sites located in this state shall, to the 5 extent practicable, equip all such macro cell tower sites with an emer- 6 gency back-up power source capable of providing adequate power to main- 7 tain the operation of such macro cell tower sites in the case of a loss 8 of power. Such emergency back-up power source shall use a renewable 9 energy system, fuel cell electric generating equipment, or an energy 10 storage system and be capable of powering a macro cell tower site for a 11 minimum of at least seventy-two hours. If a macro cell tower site is 12 already equipped with an emergency back-up power source prior to the 13 effective date of this section, then the owner or operator of such macro 14 tower site shall not be required to update such emergency back-up power 15 source to meet the requirements of this section, provided, however, that 16 once such emergency back-up power source needs to be replaced, the owner 17 or operator shall equip such macro cell tower site with an emergency 18 back-up power source that meets the requirements of this section. 19 2. For the purposes of this section, "macro cell tower site" shall 20 mean the place where wireless telecommunications equipment and network 21 components, including towers, transmitters, base stations, and emergency 22 powers necessary for providing wide area outdoor service, are located. A EXPLANATION--Matter in italics (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD02720-01-5 

 A. 2670 2 1 macro cell tower site shall not include rooftop, small cell, or outdoor 2 and indoor distributed antenna system sites. 3 § 2. This act shall take effect on the ninetieth day after it shall 4 have become a law. 

Text of A 2670 as introduced, from the official record. Connect Plus keeps every version and highlights what changed.Compare versions
GovBuddy Demo

See how GovBuddy fits your team.

Share a few details and our team will follow up with a focused walkthrough.