A 7544: Relates to enforcement of pole attachment safety and quality and utility pole and attachment identification.
The bill aims to improve the safety and quality of utility pole attachments. Utility pole owners and attachers are required to submit information that allows inspectors to identify individual equipment and owners. This information must be submitted electronically and kept in a database. The commission will create an electronic complaint form to report alleged violations, such as equipment moved in violation of laws and regulations, or attachments that do not meet industry standards. The commission will inspect reported complaints within two weeks and notify the relevant utility company or person of any violations. If a violation is determined, the utility company or person must remedy the issue within one week. If the issue is not resolved, the entity may be subject to fines, including up to $20,000 for the first violation, $50,000 for the second violation, and a stop work order for the…
- What is the current status of A 7544?
- As of September 28, 2025, A 7544 is recorded as "Introduced": it has been introduced and is waiting for its first committee hearing or floor vote. The last recorded action, on June 13, 2025, was "substituted by s6997a".
- Did A 7544 pass?
- Not yet. A 7544 has been introduced and has not passed either house.
- Who wrote A 7544, and where is it now?
- A 7544 was authored by Asm. William Magnarelli with 12 coauthors.
| Jun. 13, 2025 | substituted by s6997a |
| Jun. 13, 2025 | ordered to third reading rules cal.740 |
| Jun. 13, 2025 | rules report cal.740 |
| Jun. 13, 2025 | reported |
| Jun. 12, 2025 | reported referred to rules |
STATE OF NEW YORK ________________________________________________________________________ 7544 2025-2026 Regular Sessions IN ASSEMBLY April 1, 2025 ___________ Introduced by M. of A. MAGNARELLI -- read once and referred to the Committee on Corporations, Authorities and Commissions AN ACT to amend the public service law and the general municipal law, in relation to enforcement of pole attachment safety and quality The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. The public service law is amended by adding a new section 2 119-e to read as follows: 3 § 119-e. Utility pole and attachment identification. 1. (a) In 4 connection to a new pole attachment, or during the modification, repair 5 or inspection of a pole or pole attachment, all utility pole owners and 6 attachers shall be required to submit information that allows inspectors 7 to ensure physical identification of their equipment on a utility pole. 8 Such information shall include the (i) telecommunication or cable compa- 9 ny that owns the equipment, (ii) contractor or subcontractor responsible 10 for completing the pole attachment work, and (iii) date of work. Such 11 information shall also be submitted electronically to the commission and 12 kept in an electronic database pursuant to paragraph (b) of this subdi- 13 vision. 14 (b) The commission shall keep a record of all pole attachment work 15 including which attachers have equipment on which poles and the contrac- 16 tor, telecommunications or cable company who completed the work. 17 (c) The commission shall promulgate rules and regulations to provide a 18 uniform format or form for complying with paragraphs (a) and (b) of this 19 subdivision. 20 2. (a) The commission shall create an electronic complaint form, post- 21 ed to the commission's website, to allow members of the public and tele- 22 communications workers to report (i) telecommunications equipment moved 23 in violation of applicable laws and regulations including but not limit- 24 ed to subdivision five of section one hundred nineteen-a of this arti- 25 cle, (ii) an attachment that does not meet industry standards including EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD11374-01-5A. 7544 2 1 but not limited to the National Electrical Safety Code (NESC) and 2 Telcordia Standards, (iii) an unsafe attachment, telecommunications or 3 electrical equipment, or a pole that presents a safety hazard, and (iv) 4 anything else the commission deems necessary to protect workers and the 5 public and ensure safe pole attachment work. 6 (b) The complaint form shall include, at minimum, (i) the date and 7 time of the complaint, (ii) the location of the violation, (iii) a 8 description of the violation, and (iv) information on the pole owner, 9 attacher or contractor, if available. Such form shall allow for the 10 submission of photographs. 11 3. The commission shall be required to inspect a reported complaint 12 within two weeks of the submission of such complaint. 13 4. (a) Where the commission finds a violation outlined in subdivision 14 two of this section, any public utility company, corporation or person 15 and the officers, attachers, agents and employees shall be subject to 16 penalties set forth in subdivision two of section twenty-five of this 17 chapter and as further set forth in this subdivision. The commission 18 shall notify the responsible telecommunications or cable company and 19 their contractor of its findings in writing. 20 (i) Upon a first violation, the responsible party may be subject to a 21 twenty thousand dollar fine. 22 (ii) Upon a second violation, the responsible party may be subject to 23 a fifty thousand dollar fine. 24 (iii) Upon a third violation, the responsible party may be subject to 25 a stop work order in the county where any of the violations were made. 26 (b) The commission shall issue a fine of no less than twenty thousand 27 dollars for violations of the provisions of subdivision five of section 28 one hundred nineteen-a of this article. 29 5. The commission shall compile a semiannual list of attachers, inter- 30 net service providers and their contractors that have received three or 31 more complaints. The commission shall distribute such list to relevant 32 agencies including but not limited to the division of broadband access, 33 as established in section sixteen-gg of the urban development corpo- 34 ration act. Notwithstanding any other provision of law, a contractor, 35 telecommunications or cable company that appears on the list shall be 36 deemed ineligible for any direct or indirect state grants, state guaran- 37 teed loans or tax benefits for three years after the date such list is 38 published. 39 § 2. The general municipal law is amended by adding a new section 40 109-e to read as follows: 41 § 109-e. Additional requirements for right-of-way permits. As a 42 requirement of obtaining a public right-of-way permit, all applicants 43 shall disclose to the local permitting authority of a municipality prior 44 to the issuance of such permit the identity of each contractor, subcon- 45 tractor, or agent that will perform work authorized by the permit in the 46 right-of-way, whether a sole proprietor, independent contractor, compa- 47 ny, or other entity. If there are any changes to the entities that will 48 perform permitted work in the right-of-way after submission, the appli- 49 cant shall update the municipality with the new information within twen- 50 ty-four hours. 51 § 3. This act shall take effect immediately.