Home/Bills/S 8037New York · 2025–2026 Legislative Session
Senate BillIntroduced

S 8037: Establishes a datacenter utility rate classification, providing targeted congestion management incentives for upstate New York, and regulating off-grid power connections for datacenter operations.

New York · Senate · 2025–2026 Legislative Session · last verified January 8, 2026

What S 8037 does, verified January 8, 2026

Establishes a datacenter utility rate classification, providing targeted congestion management incentives for upstate New York, and regulating off-grid power connections for datacenter operations.

Bill journey
1IntroducedCurrent
2In CommitteePending
3First Chamber FloorPending
4Second ChamberPending
5GovernorPending
6ChapteredPending
Last action: REFERRED TO ENERGY AND TELECOMMUNICATIONS (2026-01-07)Alert me
Quick answers about S 8037
What is the current status of S 8037?
As of January 8, 2026, S 8037 is recorded as "Introduced": it has been introduced and is waiting for its first committee hearing or floor vote. The last recorded action, on January 7, 2026, was "REFERRED TO ENERGY AND TELECOMMUNICATIONS".
Did S 8037 pass?
Not yet. S 8037 has been introduced and has not passed either house.
Who wrote S 8037, and where is it now?
S 8037 was authored by Sen. Robert Jackson. Its committee of record is Senate Energy & Telecommunications.
Recent actions2 total · showing 2
Jan. 07, 2026REFERRED TO ENERGY AND TELECOMMUNICATIONS
May. 15, 2025REFERRED TO ENERGY AND TELECOMMUNICATIONS
Latest bill textIntroduced version, May 15, 2025 · 836 words
  
  STATE OF NEW YORK ________________________________________________________________________ 8037 2025-2026 Regular Sessions  IN SENATE May 15, 2025 ___________ Introduced by Sen. JACKSON -- read twice and ordered printed, and when printed to be committed to the Committee on Energy and Telecommuni- cations AN ACT to amend the public service law and the energy law, in relation to establishing a datacenter utility rate classification, providing targeted congestion management incentives for upstate New York, and regulating off-grid power connections for datacenter operations The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. The public service law is amended by adding two new 2 sections 66-x and 66-y to read as follows: 3 § 66-x. Datacenter utility rate classification. 1. Each electric 4 corporation operating within the New York independent system operator 5 (NYISO) shall, upon its next general rate case filing after the effec- 6 tive date of this section, file with the commission a tariff establish- 7 ing a special rate classification for commercial datacenter operations. 8 2. A datacenter with a peak demand of less than four hundred kilowatts 9 (kW) shall not be required to take service under the datacenter tariff 10 established pursuant to this section. 11 3. A datacenter owner or operator with an aggregate statewide demand 12 of one megawatt (MW) or greater shall be required to take service under 13 the datacenter tariff, where such tariff exists in the applicable 14 service territory. 15 4. Such rate classification shall: 16 (a) Provide for competitive and nondiscriminatory electric rates for 17 qualifying datacenter customers, irrespective of their energy source 18 procurement mix. 19 (b) Facilities seeking to qualify for congestion management or local 20 employment incentives under section 5-105 of the energy law must, howev- 21 er, purchase one hundred percent of their electric energy supply from EXPLANATION--Matter in italics (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD11794-02-5 

 S. 8037 2 1 generation sources located within the state, of which a minimum of fifty 2 percent shall be derived from renewable sources. 3 5. For the purposes of this section, "renewable sources" shall include 4 energy generated from solar, wind, hydropower, geothermal, and biometh- 5 ane, provided that such biomethane is derived from manure anaerobic 6 digestion (AD) produced by farms located within the state. 7 6. For purposes of this section, "datacenter" means a facility prima- 8 rily used to house computing infrastructure for the purpose of process- 9 ing, storage, or distribution of data, typically requiring significant 10 and continuous electric load to operate servers and related equipment. 11 § 66-y. Off-grid power connections for datacenters. 1. No electric 12 generating facility serving a datacenter shall be permitted to bypass 13 public purpose funding mechanisms, including but not limited to the 14 system benefits charge, renewable energy standard, or clean energy stan- 15 dard obligations, by establishing a direct off-grid connection to such 16 datacenter. 17 2. The provisions of this section shall not apply to any datacenter 18 majority owned or majority leased by the state or any of its instrumen- 19 talities, authorities, or agencies. 20 3. The commission shall promulgate rules to ensure that any new or 21 existing direct connections between power generators and datacenters 22 remain subject to equitable contributions to state-mandated clean ener- 23 gy, public benefit, and grid reliability programs, unless otherwise 24 exempted under subdivision two of this section. 25 § 2. Article 5 of the energy law is amended by adding a new section 26 5-105 to read as follows: 27 § 5-105. NYISO congestion incentives for datacenter development. 1. 28 The New York state energy research and development authority (NYSERDA), 29 in coordination with the New York independent system operator (NYISO), 30 is hereby authorized to develop and administer congestion management 31 incentives to facilitate the development and operation of datacenters in 32 NYISO zones A through H and zone K. No incentives shall be made avail- 33 able for projects located in NYISO zones I, J, or the downstate region, 34 including New York City and Long Island. 35 2. In administering congestion management incentives, NYSERDA shall 36 consider the availability, cost, and allocation of NYISO Transmission 37 Congestion Contracts (TCCs) in the relevant zones. 38 3. Such incentives may include, but are not limited to: 39 a. targeted congestion cost mitigation for facilities meeting the 40 renewable procurement requirements specified in subdivision four of 41 section sixty-six-x of the public service law; and 42 b. local employment incentive grants or credits, conditioned on meet- 43 ing minimum employment benchmarks established by NYSERDA in consultation 44 with the department of labor. 45 4. Incentives established pursuant to this section shall only be made 46 available to datacenters qualifying under the requirements of subdivi- 47 sion four of section sixty-six-x of the public service law and located 48 in eligible NYISO zones. 49 § 3. This act shall take effect immediately. 

Text of S 8037 as introduced, from the official record. Connect Plus keeps every version and highlights what changed.Compare versions
GovBuddy Demo

See how GovBuddy fits your team.

Share a few details and our team will follow up with a focused walkthrough.