21189.81.
For purposes of this chapter, the following definitions apply:
(a) “Applicant” means a public or private entity or its affiliates, or a person or entity that undertakes a public works project, that proposes a project and its successors, heirs, and assignees.
(b) “Disadvantaged community” means an area identified by the California Environmental Protection Agency pursuant to Section 39711 of the Health and Safety Code or an area identified as a disadvantaged unincorporated community pursuant to Section 65302.10 of the Government Code.
(c) “Electrical transmission facility project” means a project for the construction and operation of an electrical transmission facility that meets either of the following:
(1) An electrical transmission facility project identified by the Independent System Operator in its annual transmission planning process that meets either of the following criteria:
(A) The project will facilitate delivery of electricity from renewable energy resources or zero-carbon resources.
(B) The project will facilitate delivery of electricity from energy storage projects.
(2) An electrical transmission facility project identified by a local publicly owned electric utility that would satisfy a transmission expansion need approved by the governing body of the local publicly owned electric utility and that meets either of the following criteria:
(A) The project will facilitate delivery of electricity from renewable energy resources or zero-carbon resources.
(B) The project will facilitate delivery of electricity from energy storage projects.
(d) (1) “Energy infrastructure project” means any of the following:
(A) An eligible renewable energy resource, as defined in Section 399.12 of the Public Utilities Code, excluding resources that combust biomass fuels.
(B) New energy storage systems of 20 megawatts or more, that are capable of discharging for at least two hours, provided that a pumped hydro facility may qualify only if it is less than or equal to 500 megawatts and has been directly appropriated funding by the state before January 1, 2023.
(C) A project for which the applicant has certified that a capital investment of at least two hundred fifty million dollars ($250,000,000) made over a period of five years and the project is for either of the following:
(i) The manufacture, production, or assembly of an energy storage system or component manufacturing, wind system or component manufacturing, and solar photovoltaic energy system or component manufacturing.
(ii) The manufacture, production, or assembly of specialized products, components, or systems that are integral to renewable energy or energy storage technologies.
(D) An electrical transmission facility project, provided that nothing in this chapter affects the jurisdiction of the California Coastal Commission pursuant to Division 20 (commencing with Section 30000) to regulate such projects if located in the coastal zone.
(E) A hydrogen production facility and associated onsite storage and processing facilities that do not derive hydrogen from a fossil fuel feedstock and that receive funding from any of the following:
(i) The Hydrogen Program established pursuant to Section 25664.1.
(ii) Section 91530, as added by the Safe Drinking Water, Wildfire Prevention, Drought Preparedness, and Clean Air Bond Act of 2024 (Section 2 of Chapter 83 of the Statutes of 2024 (Senate Bill 867)), if that act is approved by the voters at the November 5, 2024, statewide general election.
(iii) The Alliance for Renewable Clean Hydrogen Energy Systems (ARCHES) authorized by Article 15 (commencing with Section 12100.160) of Chapter 1.6 of Part 2 of Division 3 of Title 2 of the Government Code, as awarded by the United States Department of Energy Office of Clean Energy Demonstrations.
(2) Any project to develop a facility within the meaning of subdivision (b) of Section 25545 shall meet the requirements of Sections 25545.3.3 and 25545.3.5, except that those requirements shall also apply to solar photovoltaic and terrestrial wind electrical generating powerplants with a generating capacity of between 20 and 50 megawatts and energy storage projects capable of storing between 80 and 200 megawatthours of electrical energy.
(e) “Infrastructure project” means a project that is certified pursuant to Sections 21189.82 and 21189.83 as any of the following:
(1) An energy infrastructure project.
(2) A semiconductor or microelectronic project.
(3) A sustainable aviation fuel project.
(4) A transportation-related project.
(5) A water-related project.
(f) “Semiconductor or microelectronic project” means a project that meets the requirements related to investment in new or expanded facilities and is awarded funds under the federal Creating Helpful Incentives to Produce Semiconductors Act of 2022 (Public Law 117-167), commonly known as the CHIPS Act of 2022, and the requirements of Section 21183.5.
(g) “Sustainable aviation fuel project” means a project for the new construction, conversion, or expansion of a facility to manufacture, process, store, distribute, or transport sustainable aviation fuel or feedstock used for the production of sustainable aviation fuel, or to manufacture electrochemical components used for the production of sustainable aviation fuel, that meets all of the following requirements:
(1) The project meets the requirements of Section 21183.5.
(2)The project does not use fossil fuels in its production process.
(3)
(2)
If the project involves the conversion or replacement of an existing Title V source, as defined in Section 39053.5 of the Health and Safety Code, the project will reduce emissions of air pollutants compared to the baseline environmental conditions in the vicinity of the project, as determined by the applicable air district.
If the project does not involve the conversion or replacement of an existing Title V source, as defined in Section 39053.5 of the Health and Safety Code, the project will not cause a significant effect on the environment attributable to any air pollutant, as determined by the applicable air district.