Senate Concurrent ResolutionChaptered/Signed
SCR 129: Rusty Areias Highway.
What SCR 129 does, verified August 25, 2026
This measure designates a specified portion of state highway route 152 in the county of Santa Clara as the Rusty Areias Highway. The department of transportation will determine the cost of signs showing this special designation. Donations from nonstate sources will be used to cover the cost of the signs if sufficient.
Bill journey
✓IntroducedComplete
✓In CommitteeComplete
✓First Chamber FloorComplete
✓Second ChamberComplete
✓GovernorComplete
6ChapteredCurrent
Last action: Chaptered by Secretary of State. Res. Chapter 196, Statutes of 2026. (2026-08-24)Alert me
Author and sponsors
Full contact details, staff, and committees with Connect, $15/moUnlockRecent actions18 total · showing 5
| Aug. 24, 2026 | Chaptered by Secretary of State. Res. Chapter 196, Statutes of 2026. |
| Aug. 24, 2026 | Enrolled and filed with the Secretary of State at 1 p.m. |
| Aug. 19, 2026 | In Senate. Ordered to engrossing and enrolling. |
| Aug. 19, 2026 | Read. Adopted. Ordered to the Senate. |
| Aug. 11, 2026 | From committee: Be adopted. Ordered to third reading. (Ayes 10. Noes 0.) (August 10). |