A 10830: Provides that in the siting of new electric transmission facilities, priority shall be given to major electric transmission facilities that are proposed to be sited in existing rights-of-way including those owned by an electric corporation or distribution utility, or by the state, including any subdivision thereof, or a state public authority, for state highway or transportation purposes, and railroad corridors.
The bill aims to regulate the siting of new electric transmission facilities in the state. It establishes a priority order for utilizing corridors for these facilities, including existing utility corridors, highways, and recreational trails. High-voltage transmission lines can be constructed across public right-of-ways, but the commissioner of transportation must protect public safety and ensure the proper function of trunk highways. The commissioner can temporarily suspend or terminate a contractor's employment under a contract and complete the work themselves, or cancel the contract and readvertise for a new bid. The state and local governments can share costs for completing cancelled or defaulted contracts, and the state can set aside additional funds for this purpose. The bill also requires coordination between the department of transportation and utilities to review highway corrido…
- What is the current status of A 10830?
- As of May 20, 2026, A 10830 is recorded as "Introduced": it has been introduced and is waiting for its first committee hearing or floor vote. The last recorded action, on May 19, 2026, was "reported referred to rules".
- Did A 10830 pass?
- Not yet. A 10830 has been introduced and has not passed either house.
- Who wrote A 10830, and where is it now?
- A 10830 was authored by Asm. Karen McMahon with 2 coauthors. Its committee of record is Assembly Rules. It is filed under PBS, alongside 90 other New York PBS bills this session.
| May. 19, 2026 | reported referred to rules |
| May. 14, 2026 | print number 10830a |
| May. 14, 2026 | amend (t) and recommit to energy |
| Apr. 01, 2026 | referred to energy |
STATE OF NEW YORK ________________________________________________________________________ 10830 IN ASSEMBLY April 1, 2026 ___________ Introduced by M. of A. McMAHON, McDONALD -- read once and referred to the Committee on Energy AN ACT to amend the public service law and the highway law, in relation to the siting of new electric transmission facilities The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Section 141 of the public service law is amended by adding 2 a new subdivision 7 to read as follows: 3 7. (a) In the siting of new electric transmission facilities, includ- 4 ing high-voltage transmission lines, the following corridors shall be 5 utilized in the following order of priority in accordance with feasibil- 6 ity of economic and engineering considerations, reliability of the elec- 7 tric system and the protection of the environment: 8 (i) Existing utility corridors; 9 (ii) Highway (interstate, freeway and state trunk) and railroad corri- 10 dors; 11 (iii) Recreational trails, to the extent that the facilities may be 12 constructed below ground and that the facilities do not significantly 13 impact environmentally sensitive areas; and 14 (iv) New corridors. 15 (b) (i) High-voltage transmission lines, pursuant to the laws of this 16 state or the ordinance of any city or county, may be constructed, 17 placed, or maintained across any public right of way or along any trunk 18 highway, federally-aided state trunk highway, controlled access highway, 19 interstate highway, or roadway, except as deemed necessary by the 20 secretary/commissioner of transportation to protect public safety or 21 ensure the proper function of such trunk highway. 22 (ii) If the secretary/commissioner of transportation denies a high- 23 voltage electric line collocation request, the reasons for the denial 24 shall be submitted for review to the chairs and ranking minority members 25 of the committees with jurisdiction over energy and transportation, the 26 executive secretary of the public utilities commission, and the commis- 27 sioner of economic development within ninety days of such denial. EXPLANATION--Matter in italics (underscored) is new; matter in brackets [] is old law to be omitted. LBD13020-01-5A. 10830 2 1 § 2. Section 40 of the highway law, as amended by chapter 1110 of the 2 laws of 1971, is amended to read as follows: 3 § 40. Authority of commissioner of transportation with respect to the 4 performance of contracts for construction, reconstruction or improvement 5 of state highways, highway projects under the supervision of the depart- 6 ment of transportation, bridges, grade crossing eliminations and stream 7 channel improvements; completion of work by surety; cancellation of 8 contract by the commissioner [of transportation]. 1. The performance of 9 every contract for the construction, reconstruction or improvement of a 10 state highway, bridge, grade crossing elimination or stream channel 11 improvement shall be under the supervision and control of the commis- 12 sioner [of transportation], and it shall be [his] such commissioner's 13 duty to see that every such contract is performed in accordance with the 14 provisions of the contract and with the plans and specifications forming 15 a part thereof. If the commissioner [of transportation] shall determine 16 that the work upon any contract for the construction, improvement, main- 17 tenance, repair or reconstruction, of a state highway, other highway 18 under the supervision of the department [of transportation], bridge, 19 grade crossing elimination or stream channel improvement, is not being 20 performed according to the contract or for the best interest of the 21 state, the execution of the work by the contractor may be temporarily 22 suspended by [the] such commissioner [of transportation], who may then 23 proceed with the work under [his] their own direction in such manner as 24 will accord with the contract specifications and be for the best inter- 25 ests of the state; or [he] such commissioner may terminate the contrac- 26 tor's employment under the contract while it is in progress, and there- 27 upon, proceed with the work, in affirmance of the contract, by contract 28 negotiated or publicly let, by the use of [his] their own forces, by 29 calling upon the surety to complete the work in accordance with the 30 plans and specifications or by a combination of any such methods; or 31 [he] their may cancel the contract and either readvertise and relet as 32 provided in section thirty-eight of this [chapter] article, or complete 33 the work under [his] their own direction in such manner as will accord 34 with the contract specifications and be for the best interests of the 35 state. Any excess in the cost of completing the contract beyond the 36 price for which it was originally awarded shall be charged to and paid 37 by the contractor failing to perform the work or [his] such contractor's 38 surety. Where the estimate for the completion of a cancelled contract 39 or defaulted contract, or a contract being completed pursuant to the 40 provisions of this section, is in excess of the balance of the amount 41 originally set aside by the state to provide for the construction, 42 reconstruction, improvement, maintenance or repair of such highway, or 43 other construction project, together with any amount appropriated by the 44 county, town or village for such improvement, the commissioner [of45transportation] is authorized to set aside from any funds available for 46 the construction or reconstruction of state highways, highway projects 47 under the supervision of the department [of transportation], bridges, 48 grade crossing eliminations and stream channel improvements, an addi- 49 tional sum equal to such excess including the proportionate share of the 50 county, town or village; and to pay such excess in the first instance, 51 including the share of the county, town or village, pending recovery of 52 excess cost from the defaulting contractor or [his] such contractor's 53 surety, as provided in this section. In the event that the state fails 54 to recover from the defaulting contractor or surety the excess cost in 55 completing the contract over the amount for which it was originally 56 awarded, the county, town, or village shall pay to the state upon theA. 10830 3 1 demand of the commissioner [of transportation] the same proportion of 2 such excess cost as was originally appropriated by the county, town or 3 village, for the improvement, and the board of supervisors, town board 4 or village trustees shall be subject to mandamus proceedings by the 5 attorney general to enforce the payment of the share of the county, town 6 or village of such excess cost. Every contract for the construction, 7 improvement, maintenance, repair or reconstruction of a state highway, 8 highway project under the supervision of the department [of transporta-9tion], bridge, grade crossing elimination or stream channel improvement, 10 shall reserve to the commissioner [of transportation] the right to 11 suspend or cancel the contract as above provided, and to complete the 12 work thereunder by contract negotiated or publicly let or by the use of 13 [his] their own forces, or affirm the contract and thereupon to complete 14 the work thereunder according to any of the methods above provided as 15 the commissioner [of transportation] may determine. 16 2. Upon written request, the commissioner shall engage in coordination 17 activities with a utility or transmission line developer to review 18 requested highway corridors for possible permitted locations of trans- 19 mission lines. A project coordinator shall be assigned within thirty 20 days of the written request. The department shall share all known plans 21 with utilities on potential future projects that could impact the place- 22 ment of a high-voltage transmission line. 23 3. (a) When a permittable route along a highway corridor has been 24 identified by the department and the utility or developer, the depart- 25 ment shall engage in consultation with the utility or developer to 26 develop a "constructability report" to be utilized by both parties when 27 co-location projects are being planned and approved. The report shall be 28 approved by both parties prior to the department issuing a permit for 29 use of the highway right-of-way. 30 (b) A constructability report shall be prepared by the utility in 31 consultation with the department and shall include the terms and condi- 32 tions for building the co-location project. Included within such report 33 shall be an agreed upon timeframe for which there will not be any 34 request by the department for relocation of the transmission line. If 35 the department needs a transmission line in its right-of-way relocated, 36 it shall give the utility a ten-year advance notice. Should the depart- 37 ment require the relocation of a transmission line sooner than what is 38 agreed upon, and/or gives less than a ten-year notice of relocation, 39 then the department shall be responsible for seventy-five percent of the 40 re-location costs. 41 § 3. This act shall take effect on the ninetieth day after it shall 42 have become a law; provided, however, that the amendments to section 141 43 of the public service law made by section one of this act shall not 44 affect the repeal of such section and shall be deemed repealed there- 45 with.