Home/Bills/S 4672New York · 2025–2026 Legislative Session

S 4672: Requires signage on state highways designating where there is a zero-emission charging and refueling station that is open and available to the public within three miles of an exit or off-ramp.

New York · Senate · 2025–2026 Legislative Session · last verified January 8, 2026

What S 4672 does, verified January 8, 2026

The bill aims to improve navigation for electric and hydrogen fuel cell vehicles on New York state highways. It requires the development and implementation of an official business directional sign program to provide information about publicly available zero-emission vehicle charging and refueling stations. The program will include guidelines for the installation and maintenance of signage designating these stations within three miles of interstate or primary highway system exits or off-ramps. The bill also ensures that the program is integrated with information centers provided for travelers and that the installation of signage occurs during regular maintenance for existing signs. The bill defines "zero-emission vehicle" as a motor vehicle that operates without direct emission of atmospheric pollutants. The law will take effect on the 90th day after it becomes a law and apply to signage…

Bill journey
✓IntroducedComplete
✓In CommitteeComplete
✓First Chamber FloorComplete
4Second ChamberCurrent
5GovernorPending
6ChapteredPending
Last action: REFERRED TO TRANSPORTATION (2026-01-07)Alert me
Quick answers about S 4672
What is the current status of S 4672?
As of January 8, 2026, S 4672 is recorded as "Passed first house": it has passed the chamber it started in and is now before the second chamber. The last recorded action, on January 7, 2026, was "REFERRED TO TRANSPORTATION".
Did S 4672 pass?
Not yet. S 4672 has passed its house of origin and is now before the second chamber, where it needs committee approval and a floor vote.
Who wrote S 4672, and where is it now?
S 4672 was authored by Sen. Robert Jackson with 1 coauthor. Its committee of record is Senate Transportation. It is filed under HAY, alongside 12 other New York HAY bills this session.
Recent actions12 total · showing 5
Jan. 07, 2026REFERRED TO TRANSPORTATION
Jan. 07, 2026returned to senate
Jan. 07, 2026died in assembly
May. 29, 2025referred to transportation
May. 29, 2025DELIVERED TO ASSEMBLY
Full action history, 7 earlier actionsConnect Plus
Latest bill textIntroduced version, February 11, 2025 · 461 words
  
  STATE OF NEW YORK ________________________________________________________________________ 4672 2025-2026 Regular Sessions  IN SENATE February 11, 2025 ___________ Introduced by Sens. JACKSON, COMRIE -- read twice and ordered printed, and when printed to be committed to the Committee on Transportation AN ACT to amend the highway law, in relation to installing zero-emission charging and refueling station signs on New York state highways The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Section 88 of the highway law is amended by adding a new 2 subdivision 12-a to read as follows: 3 12-a. (a) The commissioner shall develop and implement, upon federal 4 approval if necessary, an official business directional sign program to 5 provide directional information regarding the presence of publicly 6 available zero-emission vehicle charging and refueling stations. Such 7 program may be incorporated into the official business directional sign 8 program implemented by the commissioner pursuant to subdivision twelve 9 of this section. The official business zero-emission vehicle station 10 directional sign program guidelines shall include the installation and 11 maintenance of signage designating where publicly accessible zero-emis- 12 sion vehicle charging and refueling stations are located within three 13 miles of a roadway exit or off-ramp in accordance with the manual on 14 uniform traffic control devices. 15 (b) The official business zero-emission vehicle station directional 16 sign program shall be integrated with, but not limited by, information 17 centers provided for in subdivision ten of this section to maximize the 18 information made available in the specific interest of the traveling 19 public. 20 (c) The installation of zero-emission vehicle charging and refueling 21 station signage shall only occur during the regular course of mainte- 22 nance for existing signage. The commissioner shall seek to speed federal 23 approval of the official business zero-emission vehicle directional sign 24 program if such approval is necessary. EXPLANATION--Matter in italics (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD09365-01-5 

 S. 4672 2 1 (d) For purposes of this section "zero-emission vehicle" shall mean a 2 motor vehicle that is propelled by an electric motor and associated 3 power electronics which provide acceleration torque to the drive wheels 4 during normal vehicle operation and draws electricity from a hydrogen 5 fuel cell or from a battery which is capable of being recharged from an 6 external source of electricity; or otherwise operates without direct 7 emission of atmospheric pollutants. 8 § 2. This act shall take effect on the ninetieth day after it shall 9 have become a law and apply to signage installed or maintained by the 10 department of transportation on or after such effective date. 

Text of S 4672 as introduced, from the official record. Connect Plus keeps every version and highlights what changed.Compare versions
GovBuddy Demo

See how GovBuddy fits your team.

Share a few details and our team will follow up with a focused walkthrough.