Home/Bills/A 8543New York · 2025–2026 Legislative Session
Assembly BillIntroducedENG

A 8543: Allows new buildings where new parking is provided to have an optional, charger-agnostic, power-based allocation method alternative to certain electric vehicle charging infrastructure requirements; requires the department of state division of building standards and codes to promulgate rules and regulations relating to such alternative.

New York · Assembly · 2025–2026 Legislative Session · last verified July 2, 2026

What A 8543 does, verified July 2, 2026

The proposed law aims to allow new buildings with new parking to have an optional, charger-agnostic power-based allocation method. This method would enable electric vehicle charging infrastructure requirements to be met based on the total kilowatt power capacity available for charging electric vehicles, without mandating a specific number or type of charging stations. The law also establishes guidelines for calculating aggregate power capacity, ensuring equitable access to charging options, and flexibility for property owners to select charging types based on power levels. The law requires the department of state to promulgate rules and regulations for the optional method, ensuring compliance with safety and accessibility requirements.

Bill journey
1IntroducedCurrent
2In CommitteePending
3First Chamber FloorPending
4Second ChamberPending
5GovernorPending
6ChapteredPending
Last action: print number 8543a (2026-02-18)Alert me
Quick answers about A 8543
What is the current status of A 8543?
As of July 2, 2026, A 8543 is recorded as "Introduced": it has been introduced and is waiting for its first committee hearing or floor vote. The last recorded action, on February 18, 2026, was "print number 8543a".
Did A 8543 pass?
Not yet. A 8543 has been introduced and has not passed either house.
Who wrote A 8543, and where is it now?
A 8543 was authored by Asm. Al Stirpe with 10 coauthors. It is filed under ENG, alongside 8 other New York ENG bills this session.
Author and sponsors
Full contact details, staff, and committees with Connect, $16/moUnlock
Coauthors
William ConradAnna KellesChris EachusBrian CunninghamJo Anne SimonPhil SteckSarahana ShresthaYudelka TapiaKeith BrownSteve Stern
Recent actions4 total · showing 4
Feb. 18, 2026print number 8543a
Feb. 18, 2026amend and recommit to energy
Jan. 07, 2026referred to energy
May. 20, 2025referred to energy
Latest bill textIntroduced version, May 20, 2025 · 487 words
  
  STATE OF NEW YORK ________________________________________________________________________ 8543 2025-2026 Regular Sessions  IN ASSEMBLY May 20, 2025 ___________ Introduced by M. of A. STIRPE -- read once and referred to the Committee on Energy AN ACT to amend the energy law, in relation to allowing new buildings where new parking is provided to have an optional, charger-agnostic, power-based allocation method alternative to certain electric vehicle charging infrastructure requirements The People of the State of New York, represented in Senate and Assem- bly, do enact as follows: 1 Section 1. Subparagraphs (i) and (ii) of paragraph (a) of subdivision 2 9 of section 11-104 of the energy law, as added by chapter 111 of the 3 laws of 2025, are amended and two new subparagraphs (iii) and (iv) are 4 added to read as follows: 5 (i) "electric vehicle ready infrastructure" shall mean all electrical 6 components, terminating in a receptacle or outlet, as necessary to 7 enable electric vehicle charging and support electric vehicle charging 8 stations; [and] 9 (ii) "electric vehicle charging station" shall mean all the equipment 10 necessary to deliver electricity from a source outside an electric vehi- 11 cle into one or more electric vehicles, as defined by the code coun- 12 cil[.]; 13 (iii) "power-based allocation method" shall mean a compliance approach 14 that allows electric vehicle charging infrastructure requirements to be 15 met based on the total kilowatt power capacity available for charging 16 electric vehicles, without mandating a specific number or type of charg- 17 ing stations; and 18 (iv) "charger-agnostic" shall mean a standard or method that does not 19 require the use of a specific type or brand of electric vehicle charger 20 and allows for the use of Level 1, Level 2, or DC fast chargers, depend- 21 ing on power availability and site conditions. 22 § 2. Subdivision 9 of section 11-104 of the energy law is amended by 23 adding a new paragraph (e) to read as follows: EXPLANATION--Matter in italics (underscored) is new; matter in brackets [ ] is old law to be omitted. LBD11280-02-5 

 A. 8543 2 1 (e) Within twelve months of the effective date of this paragraph, the 2 department of state division of building standards and codes shall 3 promulgate rules and regulations establishing an optional, charger-ag- 4 nostic, power-based allocation method alternative to meet the require- 5 ments of this subdivision. Such rules shall include, but not be limited 6 to: 7 (i) guidelines for calculating aggregate power capacity for electric 8 vehicle charging stations in parking lots; 9 (ii) standards ensuring equitable access to charging options for vari- 10 ous types of electric vehicles; 11 (iii) flexibility for property owners to select appropriate charging 12 types based on power levels; and 13 (iv) provisions to ensure compliance with all applicable safety and 14 accessibility requirements. 15 § 3. This act shall take effect immediately. 

Text of A 8543 as introduced, from the official record. Connect Plus keeps every version and highlights what changed.Compare versions
GovBuddy Demo

See how GovBuddy fits your team.

Share a few details and our team will follow up with a focused walkthrough.